Scale Helicopters
Back to Build Stories
Build Story

1/4 Scale Lama - REBUILD

Photo
PhotoPhotoPhotoPhoto
Chapter 1 of 7

Digging In

Jun 15, 2022

Welcome to Chapter 1 of the Lama Rebuild. To read about what happened, check out this article: https://scalehelipilot.com/articles/b4cfc49e-1491-4f3f-9fe8-7ee5883...

FUSELAGE CRACKS
For the rebuild, I started with the fuselage cracks. After the hard landing, there were cracks in the left and right mounting sections of the fuse. A bit of fiberglass cloth (Home Depot) and 5-minute epoxy did the trick.

SCALE PARTS
I simply re-attached the left vent with epoxy. Nothing burger.

HEAD
The cables that run from grip to grip had all sheared on one side. I bought small electrical terminals (Home Depot) and crimped them onto the cables. Again, a nothing burger.

PREPPING
The remainder of what I am able to do before the parts arrive encompasses disassembling the "cage" around the mechanics as well as the tail drive system. I inspected the tail rotor and it appears nominal. Now, all I can do is wait for my shipment of parts. I expect to have the tail lattice, main cage and skids all powder coated in gloss black. I have a local outfit doing this.

Stay tuned!

Chapter 1: Digging In
Chapter 1: Digging InChapter 1: Digging InChapter 1: Digging InChapter 1: Digging In