Scale Helicopters
Back to Build Stories
Build Story

Building a Vario Bell 230 1:7 800 size

Photo
PhotoPhotoPhotoPhoto
Chapter 1

Building a Vario Bell 230 1/7 800 Size Trex 700 Mechanics

Jun 17, 2024

Building a Vario Bell 230 1/7 800 Size model
Starting from a second hand fuselage
Installing additional glassfiber layer for sufficient groundplate stability.
Adding a Carbon / Kevlar layer for the Lipo compartiment.
Using Aerosyl to make a very thick and light filling epoxy compound.
Closing the existing swashplate hole, new smaller opening that fits the new rotorshaft position.
Restoring the alu retract control rod that was cut apart.

Chapter 1: Building a Vario Bell 230 1/7 800 Size Trex 700 Mechanics
Chapter 1: Building a Vario Bell 230 1/7 800 Size Trex 700 MechanicsChapter 1: Building a Vario Bell 230 1/7 800 Size Trex 700 MechanicsChapter 1: Building a Vario Bell 230 1/7 800 Size Trex 700 MechanicsChapter 1: Building a Vario Bell 230 1/7 800 Size Trex 700 Mechanics
Chapter 2

Installing the Trex 700 mechanics

Jun 17, 2024

Installing the Trex 700 mechanics, using a 800 strech kit to get a longer tailboom.
Milling the Alu subframe to support the mechanics starting from a 60 x 60 x 2 mm Alu profile.
Using the existing mounting holes of the original carboside plates.

Chapter 2: Installing the Trex 700 mechanics
Chapter 2: Installing the Trex 700 mechanicsChapter 2: Installing the Trex 700 mechanicsChapter 2: Installing the Trex 700 mechanicsChapter 2: Installing the Trex 700 mechanics
Chapter 3

Modifying the tailrotor

Jun 17, 2024

Modifying the tailrotor components in order to fit the tight space at the end of the fuselage.
Lowering the control arm by 8mm.
Tailrotor is installed on the left side of the fuselage.
New Sullivan style control rod for tailrotor pitch control.
Main rotor direction has to be changed from CW to CCW.

Chapter 3: Modifying the tailrotor
Chapter 3: Modifying the tailrotorChapter 3: Modifying the tailrotorChapter 3: Modifying the tailrotorChapter 3: Modifying the tailrotor
Chapter 4

Rotorhead and main shaft

Jun 17, 2024

Modifying the rotorhead.
Changing the main hub, no arms needed in the new head setup.
New 3mm ptich control rods.
Machining the main shaft.

Chapter 4: Rotorhead and main shaft
Chapter 4: Rotorhead and main shaftChapter 4: Rotorhead and main shaftChapter 4: Rotorhead and main shaftChapter 4: Rotorhead and main shaft
Chapter 5

Installing tailrotor into the fuselage

Jun 17, 2024

Fitting the tailrotor in the tight tailboom end space.
Merge the tailrotor bearing housing on to the fuselage.
Milling out the pocket for the tailrotor bearing housing in the tail fin.

Chapter 5: Installing tailrotor into the fuselage
Chapter 5: Installing tailrotor into the fuselageChapter 5: Installing tailrotor into the fuselageChapter 5: Installing tailrotor into the fuselage
Chapter 6

Mechanics upper support profile

Jun 17, 2024

Milling the upper side support profile for additional stiffness between the mechanics and the fuselage.
Using the original mounting holes of the carbon side frame.

Chapter 6: Mechanics upper support profile
Chapter 6: Mechanics upper support profileChapter 6: Mechanics upper support profileChapter 6: Mechanics upper support profileChapter 6: Mechanics upper support profile
Chapter 7

Machining central piece swashplate follower / securing torque tube

Jun 20, 2024

Machining central piece for swashplate follower.
Using Align H70H009XXT control arm. (Tri blade head)
Due to the reversed rotation direction, the alu cross pieces may detach from the tube.
Securing torque tube end pieces with extra M2 bolt/nut.

Chapter 7: Machining central piece swashplate follower / securing torque tube
Chapter 7: Machining central piece swashplate follower / securing torque tubeChapter 7: Machining central piece swashplate follower / securing torque tubeChapter 7: Machining central piece swashplate follower / securing torque tubeChapter 7: Machining central piece swashplate follower / securing torque tube
Chapter 8

Completing mechanics / electrics / fuselage stabilisers

Jul 6, 2024

Machining Lipo battery connectors (2 x 6 S)
The Lipo's will be installed left and right of the mechanics.
Installing BEC and capacitor backup unit.
Installing vertical stabilisers adding Aerosyl to the epoxy resin (thixotrophy powder, making the epoxy resin light, while creating more volume)

Chapter 8: Completing mechanics / electrics / fuselage stabilisers
Chapter 8: Completing mechanics / electrics / fuselage stabilisersChapter 8: Completing mechanics / electrics / fuselage stabilisersChapter 8: Completing mechanics / electrics / fuselage stabilisersChapter 8: Completing mechanics / electrics / fuselage stabilisers
Chapter 9

Maiden flight

Jul 13, 2024

Maiden flight @ 1400 rpm, smooth and easy like a scale machine should fly.
Rock steady on the tail and head.

Chapter 10

Finishing work on the doghouse and tailboom

Aug 24, 2024

Installing turbine exhaust ports
Finishing work on the tailboom and put on the primer
Installing Lipo battery support plates.

Chapter 10: Finishing work on the doghouse and tailboom
Chapter 10: Finishing work on the doghouse and tailboomChapter 10: Finishing work on the doghouse and tailboomChapter 10: Finishing work on the doghouse and tailboomChapter 10: Finishing work on the doghouse and tailboom
Chapter 11

Paint job done

Sep 16, 2024

Fuselage painted, now the details and lightning had to be installed.
Helicopter owner : Hans Devos
Paint job: Hedwig Lootens

Chapter 11: Paint job done
Chapter 11: Paint job doneChapter 11: Paint job doneChapter 11: Paint job done