Scale Helicopters
Back to Build Stories
Build Story

Hughes 500E Heli Center Berlin

Chapter 2 of 2

Navigation lights

Nov 11, 2025

Installation of navigation lights and general checkup.
Replaced the Heli Jive ESC with a Kolibri HV-i , so i have telemetry readings on my TX.
Costum made taillight support. PCB board and copper tube soldering.
Some turning work on the lathe for the upper and lower light supports.
Alu sockets gives easy insert and replace, and additional cooling for the leds.
Additional carbon support plate for the unilight controller.

Chapter 2: Navigation lights
Chapter 2: Navigation lightsChapter 2: Navigation lightsChapter 2: Navigation lightsChapter 2: Navigation lights