Build Story
Bell UH1N final assembly
Chapter 1 of 5
Vario 1/6 Bell UH1N Final assembly
Jul 10, 2025
After years of building, final assembly.
M blade 175 mm "S" schaped tail rotor blades.
Wiring of the ESC / Telemetry connections
Dual RX setup connected to the Dual RX inputs of the Axon FBL system.
Unilight navigation lights wiring

Danny D.








16 Comments
Danny amazing work... as always...
Thanks, we like to do it right.
Excellent!
Thanks pal !
Excellent work and detail. How did you add the rivets?
They were milled with a stainless steel tube in a handheld drilling machine. I will post some extra pictures .
This is the milling aid strip, so the distance of the rivets is consistent.
This is how it works.
Stainless steel tube 3 x 2 mm
The big advantage is that you can continue uninterrupted, no glue that has to cure.
good job 👍
Thank you, this working method has no depth reduction after painting
Hi Danny, I switched from blue to yellow cruciforms on the tail coupling. The yellows are more durable and less susceptible to deformation than the blues.
Thanks for your reply, i will keep it in mind.
Well done!
Great job Danny