Scale Helicopters
Back to Build Stories
Build Story

Vario Bell 230 Building

Chapter 3 of 12

Tail rotor installation and modification.

Jul 4, 2025

Adapting and installation of the tail rotor housing.
The tail rotor has to be installed inverted to be scale true, so pitch control on the upper side.
Modification of the rudder control arm bridge, lower the control arm due to the narrow tail boom end.
Solid rock fixture of the gearbox in the tail boom fuselage.
Tail fin fixed straight on the gearbox with the tail boom fuselage in between.

Chapter 3: Tail rotor installation and modification.
Chapter 3: Tail rotor installation and modification.Chapter 3: Tail rotor installation and modification.Chapter 3: Tail rotor installation and modification.Chapter 3: Tail rotor installation and modification.