Build Story
Final assembly Vario Bell 230
Chapter 1
Final assembly
Apr 19, 2026
Tail rotor installation
Rear navigation light installed in Alu tube for additional cooling.
Wing lights.
All navigation light equipment is from Unilight Austria
How People Feel About Chapter 15 pilots reacted
Chapter 2
Unilight controller wiring and modified battery fixation system.
Apr 19, 2026
Navigation light controller and channel wiring.
All wiring and controller unit attached to the base frame, so it comes with the mechanics in case of disassembly.
7 navigation leds on 4 channels, so some channels serve multiple leds.
Slots milled in the CF battery plates for easy Velcro strap fixation
How People Feel About Chapter 22 pilots reacted
Chapter 3
Installation mechanics
Apr 20, 2026
Installing mechanics
Fixation windows (Metrical 1.5mm screws)
Assembly and fixation of the doors.
Final wiring and adjustment speed behavior retracts.
Installing capacitor backup system.
How People Feel About Chapter 37 pilots reacted
5 Comments on Chapter 3
Signing in takes just a code.Sign In to Comment
Danny D.
































Dimitri R.
Uwe B.
Butch W.
2 Comments on Chapter 1
That will be a happy owner! What a nice job! Perfect!
Thanks !