Build Story
Vario Starwood Lama Project Build
Chapter 2 of 20
Pre-Assembly
May 3, 2022
First up is to build and fly the model before painting and final detail. I test fit parts together and plan for any modifications required. All welds are rough at this point and will be ground before painting. The tail rotor drive shaft bearings will be adjusted and fixed to follow a true drive shaft alignment. The skid to frame mounting blocks required a custom rubber spacer, not as shown. The next few chapters depict the rough assembly.
How People Feel About Chapter 2
Signing in takes just a code.Sign In to Comment
Thomas D.













