Back to Build Stories
Build Story

Sikorsky S-92. Book 2, “Polyphia”

Chapter 29 of 40

Damm Groundhog!!!

Feb 19, 2026

UIH.

I see it has been some time since I have posted any build progress on my VH-92 project. I have moved along in some areas however that vermet did take some wind out of the sails with 6 more weeks of winter.

Anyway, I have been working on some exterior details and also finalizing the cockpit instrument panel, center console panel and overhead switch panel. Also got the cabin window bezels finalized and some structural detail around the work steps in place. All this prep is working towards a last coat of primer and final sanding then laying out the structural lines for the gazillion rivets required. Some of the exterior detail cannot be added until these lines are laid so the doublers are located correctly with the rivet layout.

Looks like rain maybe some snow again this weekend here in Zoo York so hopefully a full weekend of ahop time.

Here are some progress pics.

Thanks for dropping by.

A nice pic of Clifford as well. 115 lbs just over a year old and still just like a puppy.

UIH,

B

Chapter 29: Damm Groundhog!!!
Chapter 29: Damm Groundhog!!!Chapter 29: Damm Groundhog!!!Chapter 29: Damm Groundhog!!!Chapter 29: Damm Groundhog!!!
How People Feel About Chapter 296 pilots reacted

4 Comments on Chapter 29

Signing in takes just a code.Sign In to Comment

love the supervisor....

That's Clifford. He just turned a year and is pushing 120lbs. He keeps an eye on things.

Ha

It all looks so nice. I cannot guess at the man-hours for those panels alone!

I wont guess either. I believe I work for about $.01 per hour but maybe a little less. UIH,