Back to Build Stories
Build Story

Vario Bell 230 1:5 Build (Becoming a Bell 222)

Chapter 4 of 26

Compromises, Cowling Vents and the Tail Mount

Nov 29, 2026

May 17, 2026

I shouldn't be surprised. Gonna have to compromise a n some of this.

Between major surgery, frame placement and aversion to excessive work, we will modify the plane a bit, but, it will be closer to the real thing than presently.

I will say that this particular fuse, as compared to the MD500, is substantially more symmetrical and square...which is making some other aspects much easier.

May 20, 2026

Tackled the Bell 222 Engine cowling vent holes. Took a few tries of setting up the tape lines to get things right.

There is a distinct lack of reference photos showing the top of the cowling...however I did mangae to contact a B222 operator who was kind enough to take some photos. Here is the result:

Next we worked on the tail mount. Blind nuts located inside the vertical stab.

Marked and drilled out the boom.

Also marked up a mid boom support for the pitch link rod...

Chapter 4: Compromises, Cowling Vents and the Tail Mount
Chapter 4: Compromises, Cowling Vents and the Tail MountChapter 4: Compromises, Cowling Vents and the Tail MountChapter 4: Compromises, Cowling Vents and the Tail MountChapter 4: Compromises, Cowling Vents and the Tail Mount
How People Feel About Chapter 41 pilot reacted
Signing in takes just a code.Sign In to Comment