Scale Helicopters
Back to Build Stories
Build Story

Vario Starwood Lama Project Build

Chapter 2 of 20

Pre-Assembly

May 3, 2022

First up is to build and fly the model before painting and final detail. I test fit parts together and plan for any modifications required. All welds are rough at this point and will be ground before painting. The tail rotor drive shaft bearings will be adjusted and fixed to follow a true drive shaft alignment. The skid to frame mounting blocks required a custom rubber spacer, not as shown. The next few chapters depict the rough assembly.

Chapter 2: Pre-Assembly
Chapter 2: Pre-AssemblyChapter 2: Pre-AssemblyChapter 2: Pre-AssemblyChapter 2: Pre-Assembly