Build Story
Vario Baby Lama Build
Chapter 10 of 16
Glass & Canopy
Oct 29, 2023
It has been a bit since my last chapter but I did get some detail work done on the canopy.
1. Pre-drilled and screwed in the glass pieces, but NOT ALL OF THEM. I left off the four front pieces so I can get my hands inside easily.
2. Got the doors installed with hinges and latches. Pre-drilling is essential
3. Programmed the Kontronik Kolibri 90 for a 12 second slow start.
4. Ready to test hover after connecting the Axon!
How People Feel About Chapter 10
Michael K.
4 Comments on Chapter 10
Point 3: guess wanted to say 60 seconds slow start 😄
(12 is the default shipped value)
I haven’t flown an electric in 15 years (just turbine) 😆😆 I will update the settings to 60! Thank you for the input!
Nice build , have fun 😄
+1 on the prog unit and the full 60s slow start . I always use it too. Can’t wait to see the maiden hover! Looking good