Back to Build Stories
Build Story

Vario 1:6 Jet Ranger

Photo
PhotoPhotoPhotoPhoto
Chapter 1

Final assembly after painting job

Feb 7, 2024

Align Trex 800 Trekker mechanics, new longer main shaft.

Chapter 1: Final assembly after painting job
Chapter 1: Final assembly after painting jobChapter 1: Final assembly after painting jobChapter 1: Final assembly after painting jobChapter 1: Final assembly after painting job
How People Feel About Chapter 1

6 Comments on Chapter 1

NICE !!!!!!!!!!!!

Thanks.

Very clean installation!

Mooi afgewerkt Danny , TOP

Mercie, heb geprobeerd alles aan de mechaniek te bevestigen, is dan makkelijker om uit en in te monteren.

Ik zou die wel eens willen zien als dat mogelijk zou zijn . Patriek Heydens die je wel kent ook . We wonen niet ver uiteen . 👍

Sign In to Comment
Chapter 2

The initial building of the Vario JR 3

Feb 7, 2024

From unboxing to final assembly.
Changed the rotation direction to CCW according to the original.
Adapted tail cone for easy access.
Li po compartiment reinforced with carbonfiber fabric.
Minimum woodwork, mechanics attached to landing gear base for maximum stability.
Here and there some mechanical adapting needed.

Chapter 2: The initial building of the Vario JR 3
Chapter 2: The initial building of the Vario JR 3Chapter 2: The initial building of the Vario JR 3Chapter 2: The initial building of the Vario JR 3Chapter 2: The initial building of the Vario JR 3
How People Feel About Chapter 2
Sign In to Comment
Chapter 3

Finishing final assembly.

Feb 16, 2024

Installing mechanics - fuselage connection, to ensure sustainable stability.
Unilight navigation light controller and secured wiring.
3mm Head rod links, with carbon tube overlay.
M blades 855 mm

Chapter 3: Finishing final assembly.
Chapter 3: Finishing final assembly.Chapter 3: Finishing final assembly.Chapter 3: Finishing final assembly.Chapter 3: Finishing final assembly.
How People Feel About Chapter 3

6 Comments on Chapter 3

Looks great. Nice clean installs on everything.

B

Thanks, we like it that way.

Ziet er top uit ! Alles compact gehouden . Gebeurd de aansturing van de rudder via een bowdenkabel ?

Is met een Sullivan gaine, is vrijwel spelingsvrij en goed te buigen, heb de tail rotor moeten aan de andere kant zetten waardoor de pitchsturing nu bovenaan ligt en een rechte carbon stang daardoor geen optie meer is. Ook de tail rotor draairichting heb ik moeten omkeren om schaal te zijn. Stuurt wel perfect op de rudder. Heb bewust alle electronica in het chassis gehouden, gaat er zo in en uit.

Photo from Danny D.

Fyi I use Align blade clips for both main and AC blades (here Helitec), to extend contact surface with the blades. Allows precise tightening and durability of blade root, in your case M-Blade.

Ref. 700/800: H70H001XXT

Align statement: providing bigger contact area between clip and blade, not only increase its grab reinforcement and rotation smoothly, but also avoid the scratches from the rotor holder rubbing against painting surface of blade causing expected vibration in flight.

Photo from Rémy F.

You have a point, i use them om all my 3D machines, will be usefull in this case too, less wear on the blade disks of the M blades. Thanks for the hint. Regards Danny

Sign In to Comment
Chapter 4

Almost ready....

Feb 19, 2024

Antenna's installed.
Doors installed.
Tailcone and inside wiring installed.
Optipower Ultra Guard 430 power Backup system installed.
Main rotor pitch control rods painted and installed.

Chapter 4: Almost ready....
Chapter 4: Almost ready....Chapter 4: Almost ready....Chapter 4: Almost ready....Chapter 4: Almost ready....Chapter 4: Almost ready....
How People Feel About Chapter 4

5 Comments on Chapter 4

looks fabulous man

Very nice, good job 👏

Thanks.

First time I see a flIying AMG Mercedes 😜

Danny... it really looks amazing. Klem

Sign In to Comment
Chapter 5

Finishing skid steps.

Feb 21, 2024

Anti slip layer installed on skid steps

Chapter 5: Finishing skid steps.
Chapter 5: Finishing skid steps.Chapter 5: Finishing skid steps.Chapter 5: Finishing skid steps.Chapter 5: Finishing skid steps.
How People Feel About Chapter 5

1 Comment on Chapter 5

nice touch...

Sign In to Comment
Chapter 6

Finaly finished ....

Feb 23, 2024

Jet Ranger 3 finally ready for maiden flight.
It was a pleasure building this machine, the final result of many many hours building and some thinking work.
Tomorrow the heli will go to his owner, i build it for a friend who will enjoy flying this nice machine.
I wish you a lot of safe an fun flights Dimi !

Chapter 6: Finaly finished ....
Chapter 6: Finaly finished ....Chapter 6: Finaly finished ....Chapter 6: Finaly finished ....
How People Feel About Chapter 6

3 Comments on Chapter 6

Signing in takes just a code.Sign In to Comment

Zeer mooie heli en perfect afgewerkt . Ik wou dat ik ook zo ene had . 😆👍

Mercie, is gebouwd alsof hij voor mezelf zou zijn, zou den Donald van Dovy zeggen.

Great paint scheme!!