Build Story
Building a Vario Bell 230 1:7 800 size
Chapter 8 of 11
Completing mechanics / electrics / fuselage stabilisers
Jul 6, 2024
Machining Lipo battery connectors (2 x 6 S)
The Lipo's will be installed left and right of the mechanics.
Installing BEC and capacitor backup unit.
Installing vertical stabilisers adding Aerosyl to the epoxy resin (thixotrophy powder, making the epoxy resin light, while creating more volume)
How People Feel About Chapter 84 pilots reacted
Signing in takes just a code.Sign In to Comment
Danny D.












