Build Story
Bell UH1N final assembly
Chapter 2 of 5
Painting and lettering details finished
Jul 16, 2025
Painting done, lettering finished.
Modified rudder pitch control linkage.
Turbine wheels installed.
Anti slip strips on the skids
How People Feel About Chapter 26 pilots reacted
Danny D.
















10 Comments on Chapter 2
Excellent!
Thanks pal !
Excellent work and detail. How did you add the rivets?
They were milled with a stainless steel tube in a handheld drilling machine. I will post some extra pictures .
This is the milling aid strip, so the distance of the rivets is consistent.
This is how it works.
Stainless steel tube 3 x 2 mm
The big advantage is that you can continue uninterrupted, no glue that has to cure.
good job 👍
Thank you, this working method has no depth reduction after painting