Back to Build Stories
Build Story

Mechanics for Vario R22 1:4

Chapter 11 of 13

Final wiring and installation

May 19, 2026

Final routing and wiring
ESC installation
Tailrotor install.
Swashplate assembly.
Navigation lights controller.
Optmised mainshaft clamp ring position
General FBL settings

Chapter 11: Final wiring and installation
Chapter 11: Final wiring and installationChapter 11: Final wiring and installationChapter 11: Final wiring and installationChapter 11: Final wiring and installation
How People Feel About Chapter 113 pilots reacted
Signing in takes just a code.Sign In to Comment