Back to Build Stories
Build Story

AH-1Z upgrades and Maintenance.

Chapter 2 of 2

“1347”

Nov 11, 2026

UIH,

Got the “Zulu” to the field today for an MTF after maintenance and some upgrades. Everything went great. We will take it back to the shop have a look over everything we touched in prep for the next flight.

Thanks for dropping by,

UIH,

B.

How People Feel About Chapter 2
Signing in takes just a code.Sign In to Comment