Build Story
MD500E Vario Turbine Build
Chapter 4 of 32
Mechanics Arrive and Tail Work
Sep 11, 2022
September 11, 2022
...and now things can really start happening.
September 12, 2022
Tail work…
Fitment…
Should have kept the old ones…
Went with blind nuts this time. Regular nuts were a PITA. Added paper towel with CA to prevent them getting pushed out…
(Asked whether the spring-loaded landing gear is still planned)
Yes.
Laid it all out on the computer, and by laser cutting the frames the accuracy of the geometry required can be achieved. It will also require a fair bit of accuracy in installing the frames but I think it's doable.
If worst comes to worst I can just fix them in place.
How People Feel About Chapter 4
Signing in takes just a code.Sign In to Comment
Rob M.




