Build Story
MD500E Vario Turbine Build
Chapter 9 of 32
Rudder Pedal Assembly
Feb 7, 2023
Waiting for some components to finish setting up the frame work, I decided to work on the rudder pedal assembly.
Used the same laser cut parts I did for Black Mesa. Although this time I can run the torque tube all the way through because I need space for ballast and a landing light.
Also, the links between the pedal arms and the teeter totter are the weakest point and kept breaking on the Black Mesa, so on these I wound them with thread and then added some CA.
If I find I have the space I'll re-rig it so left and right side pedal sets are connected.
How People Feel About Chapter 9
Signing in takes just a code.Sign In to Comment
Rob M.
