Back to Build Stories
Build Story

The Vario 1970mm BK-117 Build

Chapter 48 of 49

End of Season Inspection

Oct 27, 2020

Well, today was an end of season inspection of the BK-117.

I managed to put it in the air 27 times this season at about 6:30 each time for a total of 175.5 minutes of flying which for me is quite a bit.

Having experienced a tail failure in the early days (the result of not pinning the Trex torque tube ends and spinning in reverse, which unscrewed the fitting at the transmission end) I have been particularly on guard for any issues that may arise.

So for those of you who may be interested in the reliability of the Align/Vario marriage...

I am pleased to announce that the entire drive line has held up very well. This is great to see and helps reduce some of the anxiousness I felt.

- The Align Red gears are running smooth with good contact and minimal wear (DryFluid lubed).
- The (now pinned) torque tube shows no signs of loosening or wear.
- All bearings are running smooth.
- The dogbone was showing some normal wear on the nubs that run in the couplers. Re-greased. Replaced O-rings (not necessary but figured why not).
- All witness marked grub screws still in place.
- The Vario 50deg tail IGB also showed very minimal signs of wear (DryFluid lubed).
- The torque tube to tail drive crucifix fittings are all in great shape, no signs of any issues.
- The tail rotor drive (from Baumann) gears still look new and the bearings still smooth.

I cleaned out the tail rotor drive and re-greased it. Re-DryFluid'ed the other gears.

Weather permitting I may try to get a few more flights this month.

How People Feel About Chapter 48
Signing in takes just a code.Sign In to Comment