Back to Build Stories
Build Story

Vario 1:4 Scale MD500E Build

Chapter 11 of 50

T-Tail and Horizontal Stab Day

Feb 13, 2020

February 12, 2020

We now return to our regular scheduled programming...

3 hours today working on the T-tail.

Assembled the bits and then started cutting out the bottom side stiffener/mount plate.

Then worked on the beacon mount. Used some thin plywood and glued it to an area I had sanded flat. Then, much like the real heli, I laminated it in between two sheets of styrene. Cut out and attached the horizontal mount for the beacon, then a little finicky wood work to make the up-turn where it meets the tail.

Next was the horizontal stab: the reinforcement plate on top, the nav light mount, rivet lines and rear trim tabs.

Did the same thing here with the tabs that I did to modify the vertical stab profile earlier, using needles to attach and strengthen the grip of the tabs. I then ran some CA down the seam.

TEPT 38:40

...aaaand after a little dinner headed back down to attach the vanes to the side of the horizontal stab... again the Vario option wasn't quite to scale... so I made replacements. Actually went quite painlessly.

February 13, 2020

(Told the vanes look a little thick)

I assume you are talking about the vanes and not me.

Well, they are thinner than the Vario set... and I do still have to profile the edges, so I think that will help appearances.

The real heli I had access to was a D model with the V-tail, so if anyone happens to know how thick they should be, let me know.

Chapter 11: T-Tail and Horizontal Stab Day
Chapter 11: T-Tail and Horizontal Stab DayChapter 11: T-Tail and Horizontal Stab DayChapter 11: T-Tail and Horizontal Stab DayChapter 11: T-Tail and Horizontal Stab Day
How People Feel About Chapter 11
Signing in takes just a code.Sign In to Comment