Back to Build Stories
Build Story

Vario 1:4 Scale MD500E Build

Chapter 38 of 50

Mechanics Installed and Done Mostly

Jun 23, 2020

June 22, 2020

Mechanics installed.

RX batteries in their home.

Here you can see the main gear with the Dry Fluid lube, the USB for the AXON and the arming plug and RX power panel.

OK, I know some have said that any vibration from the swash link is minor in nature once the mass of the blades is added, but in dry running the mechanics the not insignificant vibration it caused really bugged me, so... I added a counterbalance... BIG difference... it runs extremely smooth now.

I don't foresee any issues with the setup; it ain't coming off and all the links clear even at max travels... but if anyone sees an issue please feel free to say so.

And a video of the mechanics during a dry run.

I am VERY happy, as this is probably the least amount of vibration I have achieved on any of my helis, and (contrary to how it sounds in the video) with the doors closed and the canopy on, the Trex slant gear drive train is very, very quiet.

phpBB [video]

Well, it is done... mostly... nav lights need a controller and then just the maiden flight and subsequent tweaking.

I think in the end we could safely call it a 200 hour project all in.

There are worse hobbies to have (although a coke habit might be cheaper).

June 23, 2020

(Noted the pushrods to the head sit at a slight angle)

Your observation is correct; there is a very slight angle to them. It is a function of the geometry between the 'J' arms on the grips and the swash. Because there is not a ball link on the grip, the link rod is fixed in relation. When pointing straight down, the rod link for the swash sits too far away from the swash ball, so when you move it in you get the slight angle.

There is a phasing adjustment in the AXON so I can tweak it.

Normally a 'J' arm setup shouldn't require a follower, but I think the length of the rods imparted a bit of slop, hence the follower to keep things solid.

June 24, 2020

(Suggested dropping the J arms for vertical pushrods and rotating the swash in software)

If I could I certainly would, but unfortunately when I tried that setup: the swash links sit at a certain radius, the grip links are at a much larger radius, such that when the swash is tilted to the max the links bind.

If I could have found a swash with a wider radius I'd do that, but had no luck.

Chapter 38: Mechanics Installed and Done Mostly
Chapter 38: Mechanics Installed and Done MostlyChapter 38: Mechanics Installed and Done MostlyChapter 38: Mechanics Installed and Done MostlyChapter 38: Mechanics Installed and Done Mostly
How People Feel About Chapter 38
Signing in takes just a code.Sign In to Comment