Back to Build Stories
Build Story

Vario 1:4 Scale MD500E Build

Chapter 7 of 50

Template Day

Feb 6, 2020

Cut out all the door frames.

Floor board templates completed.

Scanned a number of head-on photos of the MD500E and marked the strut angles. Angles were identical and dimensions true to the ones I took from the real deal.

Trimmed the front doors to a more accurate profile. Then took the cut-offs and taped them into place in the frame. These will later be glued in place and finished to blend.

Poor man's 'centerline finding device'...

I scanned the templates to drop them into Corel Draw where I could trace them and convert to AI files, which I will send to the laser cutting place. This is the center longitudinal frame... it was too big to scan in one go, so here I'm about to lay one on top of the other to make a complete unit.

TEPT: 14.0 hrs

Today was all about the templates... 7.5 hours worth. Finicky work, but the time spent here will save me time when the laser cut wood frames arrive.

Spent the better part of the day refining the frames and bulkheads.

The biggest challenge is navigating the lack of symmetry in the fiberglass fuselage.

Had to modify a couple of things: a slight extension of the front cabin floor plan and a little rework to the keel beam.

Nothing too difficult, just time consuming, but the files are ready.

I just ordered a sheet of 3mm 5-ply and once it arrives I'll hand it all over to the laser printer.

It doesn't look like much, but this is the culmination of about 14 hours of cutting, trimming, fitting, retrimming, refitting, measuring, confirming, scanning, tracing, cleaning, detailing, double checking and making things pretty.

TEPT 20.5 hours

Chapter 7: Template Day
Chapter 7: Template DayChapter 7: Template DayChapter 7: Template DayChapter 7: Template Day
How People Feel About Chapter 7
Signing in takes just a code.Sign In to Comment