Chapter 23 of 40

IP has begun.

Sep 7, 2025

UIH,

With wonderful weather across the area for the weekend, I pulled the “pneumatic cleaver” to cut out some windows. I did not remove the windshield, green house or chin windows so it would not put big azz holes where I really don't want them just yet.

I cut the side fuse cabin windows along with the cockpit side windows that allow better access to the cockpit. As there are no “cockpit” doors, working through the windows offers the beast access. The window cutouts are rough and will need final trimming to the correct opening.

Most of the parts for the IP is “slave”. It is the correct size and shape to the final product but using tools to finalize fitment.

I was really hoping to fly this weekend to tweak the Axon after the first flight checks last weekend with the new head and swash however I am happy with shop days. They are always a plus.

Here are a few pics of where the VH sits today.

Thanks as always for dropping by.

Butch.