Scale Helicopters
Back to Build Stories
Build Story

Sikorsky S-92. Book 2, “Polyphia”

Butch W.United StatesSep 7, 2024 Share
Chapter 31 of 40

A riveting tale.

Mar 6, 2026

UIH,

Over the past couple of months things have progressed slowly however not at a complete standstill. At this point of a build I find myself reviewing documentation, looking at the subject deciding how each component will be designed made and installed and the biggest task, where to start.

The VH does have some unique features. Some windows are blocked out, structural differences due to mission specific equipment internally installed plus, ,being a military aircraft, the civilian standards do not always apply.

So where does one start. Plugging a window is not a big deal. But comparing the VH to the civilian version in photos can reveal some major differences. With this on mind, something needed is the structural layout so the specific features can be drawn up, printed and installed using the basic structural layout.

That being said, the time has come to lay out reference lines for the rivet pattern or at least place a starting point. Standing back after plotting a few lines i get the feeling my fingers will never be the same after detailing the structure on the VH. I wonder if I should count all the rivets?

A few pics.

Thanks for dropping by.

UIH

B.

Chapter 31: A riveting tale.
Chapter 31: A riveting tale.Chapter 31: A riveting tale.Chapter 31: A riveting tale.Chapter 31: A riveting tale.